Case Studie

Home  > Case Studie  > 

Installation of the first phase project of Jeju casino in South Korea completed

Installation of the first phase project of Jeju casino in South Korea completed

2020-08-12

This laser cutting screen is designed by a famous Korean designer and produced by our factory. This screen has no frame. It needs to consider the weighing problem. If it is not handled properly, the product will be deformed and scrapped. The requirements for production are very high.

                 
                 
                 

This product is used for Jeju Island Casino in South Korea. It will be completed in July 2020 and sent to Jeju by sea. The first stage of installation was completed on August 12.


                 
                 
                 
Chat Online
Chat Online
Chat Online inputting...